    The drying line is composed of wet material feeding system,  hot air generating system,  drying system,  gas separation system,  screening cooling system and so on. After the wet material is dispersed, it merges with the clean hot air generated by the hot air furnace, and a strong mass and heat transfer process takes place in the pulsed air dryer, and the material is quickly dried. After the dry materials are sieved, airlifted and rapidly cooled, they are stored in the finished product bin for storage and packaging. The exhaust gas is dedusted through the dust collector and...
  • Release time: 2022 - 07 - 05
    We provide process design, equipment manufacturing, installation and operation training for rotary kiln drying line of quartz sand, feldspar powder, fluorite powder and chemical fertilizer according to the needs of users. The drying line equipment is stable and reliable in operation, simple in operation and convenient in maintenance.
  • Release time: 2022 - 07 - 05
    We can provide users with process design, equipment manufacturing, installation, commissioning and operation training for the complete set of kaolin drying production line. The key equipment for drying uses a special pulverizing dryer for kaolin, which is crushed, dried and classified together, with high yield and high thermal efficiency.
Contact information

联系电话:0571-85185926  86036218

售后服务:0571-86036279

图文传真:0571-85184885

中国 · 杭州 · 总部

联系地址:杭州市天城路神州白云大厦2栋 805

The 18th ICIF China in 2019 was held in Shanghai New International Expo Center from 18th, September to 20th, September. Our company participated in this exhibition and promoted the company's main products, such as detergent powder production equipment, liquid detergent production equipment, hot air furnace and other products.
发布时间: 2019 - 09 - 29
浏览次数:20
From August 11 to 17, our factory concentrated all resources and worked continuously. Under the close cooperation of technical, engineering and foreign trade departments,  we loaded 60 containers of detergent powder equipment within 7 days and passed customs clearance successfully. These equipment are sent to Zambia, Angola and other countries for detergent powder project.
发布时间: 2019 - 08 - 23
浏览次数:17
On August 5th, the biomass fired hot air furnace of 12 million KCal/hour for Indonesian ceramics contracted by our company was put into operation .
发布时间: 2019 - 08 - 06
浏览次数:19
The expansion project of our factory is proceeding smoothly according to the plan since April. The functional areas such as material stacking, sheet metal manufacture processing, riveting, precision machining, assembling, commissioning, testing and finished product storage are more reasonable and tidy.This will provide the solid foundation safeguard for the production.
发布时间: 2019 - 07 - 12
浏览次数:12
From June 15th to 17th, the 3rd “Industry Innovation Conference” of China Thermal Insulation Materials Association was sucessfully held in Yinchuan. More than 300 people from the China Thermal Insulation Materials Association, corporate representatives, media attended the meeting.Our company also actively participated in this meeting and promoted the company's latest generation of “cupola exhaust gas incinerator” in the rock wool industry and the latest treatment technology of VOC in the wet exhaust gas of curing furnace.Our company makes full use of its expertise in fu...
发布时间: 2019 - 06 - 20
浏览次数:17
The 1# production line of rock wool production line with an annual output of 60,000 tons which was designed and contracted by our company for Anhui Xuanming New Materials Co.,Ltd was put into operation in April. Both parties carefully examined the layout, energy consumption, emissions, process calculation, equipment selection, operation, investment and other aspects in advance, and revised and improved the design plan to achieve low production cost, environmental protection and practical operation.
发布时间: 2019 - 05 - 20
浏览次数:23
The complete set of equipment for the Indian 10TPH washing powder production line undertaken by our company completed the loading of all 12 containers on 6th, April and passed the customs declaration successfully.
发布时间: 2019 - 04 - 10
浏览次数:34
The Indonesian kaolin project, which was designed and built by our company, has passed the acceptance on 27, March, 2019. The indicators reached the design requirements and the project was delivered to the customer for normal production.
发布时间: 2019 - 03 - 29
浏览次数:20
The annual meeting of Meibao in 2018 went smoothly. Chairman Tong Yongqing summed up the company's work in 2018 and proposed planning for the company's main work in 2019. All the staff exchanged and gathered in a warm and harmonious atmosphere. At the same time, we would like to thanks to customers who have been supporting our company for a long time!! Thanks to the staff who still stick to their jobs! Thanks to all the staff for their hard work over the past year!
发布时间: 2019 - 01 - 31
浏览次数:19

Tell me your needs and submit your contents. We will contact you for the first time.!

address:Floor 14th, ZMI Plaza, No.445, Kaixuan Road, Hangzhou, Zhejiang, China      Telephone:0571-85185926
Copyright ©2016- 2018 Zhejiang MEBO industrial Polytron Technologies Inc
ICP preparation in Zhejiang Province17046615-1   Zhejiang public network preparation 33052102000289
Rhinoceros cloud services